If the PR updated cancel outstanding jobs to conserve resources.
Signed-off-by: Rob Bradford <rbradford@rivosinc.com>
(cherry picked from commit 1db30405e1)
And clean up some of the whitespace formatting so that the "name" and
"on" are grouped away from the "jobs".
Signed-off-by: Rob Bradford <rbradford@rivosinc.com>
(cherry picked from commit d9f48505fe)
Add top-level timeout for the jobs and also more agressive per step
timeouts.
Signed-off-by: Rob Bradford <rbradford@rivosinc.com>
(cherry picked from commit 1fe2771a0d)
To reduce issues caused by flaky tests split the musl and glibc jobs
into separate jobs. This means fewer jobs will need to be restarted for
flaky tests. This will also increase CI throughput since the musl builds
account for ~40% of the total CI time when run together with glibc.
Signed-off-by: Rob Bradford <rbradford@rivosinc.com>
(cherry picked from commit 2e4079becb)
This will help handle flakiness in the builds by requiring the minimum
number of restarts.
Signed-off-by: Rob Bradford <rbradford@rivosinc.com>
(cherry picked from commit d32de07be7)
Use the matrix to add a build runnind on the AMD variant of the garm
runner.
Signed-off-by: Rob Bradford <rbradford@rivosinc.com>
(cherry picked from commit 84a6da5e93)