e690d258cc ci: reduce CI load by refining workflow concurrency groups
TL;DR: Would reduce CI pressure by cancelling more "unnecessary" runs
       but I can't verify without running a merge queue.

A common development pattern is to push a change and then immediately
check CI results. Follow-up fix pushes are quite common, which leads to
multiple CI runs being queued for the same pull request.

In Cloud Hypervisor, the size and cost of the CI matrix means that
several consecutive pushes (for example 3-4 in a short time) put
significant pressure on CI runners and noticeably increase feedback
latency.

In practice, concurrency handling is especially tricky for the merge
queue. From personal experience: If one does not take special care, CI
runs triggered by a `merge_group` can cancel each other, as in a merge
queue there are two runs for each job by default: one for the normal PR
and one for the merge commit. This is easy to run into, also because the
available documentation and best practices for this feature are not very
good.

At the same time, our workflows do not run on `push` events, but only
on `pull_request` and `merge_group`. Because of this, using
`${{ github.ref }}` alone as a concurrency key is not very meaningful,
and in practice only few runs are actually cancelled for successive PR
updates. Therefore, we should improve the usage of this feature.

This change tries to improve the situation by refining the concurrency
group key. The goal is to keep cancellation for multiple PR pushes,
while at the same time preventing unintended cancellations in the merge
queue by separating `merge_group` runs from regular PR runs.

Signed-off-by: Philipp Schuster <philipp.schuster@cyberus-technology.de>
On-behalf-of: SAP philipp.schuster@sap.com
2026-02-03 17:19:09 +00:00
dependabot[bot]
0ff8d1cb28 build: Bump actions/checkout from 5 to 6
Bumps [actions/checkout](https://github.com/actions/checkout) from 5 to 6.
- [Release notes](https://github.com/actions/checkout/releases)
- [Changelog](https://github.com/actions/checkout/blob/main/CHANGELOG.md)
- [Commits](https://github.com/actions/checkout/compare/v5...v6)

---
updated-dependencies:
- dependency-name: actions/checkout
  dependency-version: '6'
  dependency-type: direct:production
  update-type: version-update:semver-major
...

Signed-off-by: dependabot[bot] <support@github.com>
2025-11-22 00:05:53 +00:00
dependabot[bot]
3d5e5f318b build: Bump actions/checkout from 4 to 5
Bumps [actions/checkout](https://github.com/actions/checkout) from 4 to 5.
- [Release notes](https://github.com/actions/checkout/releases)
- [Changelog](https://github.com/actions/checkout/blob/main/CHANGELOG.md)
- [Commits](https://github.com/actions/checkout/compare/v4...v5)

---
updated-dependencies:
- dependency-name: actions/checkout
  dependency-version: '5'
  dependency-type: direct:production
  update-type: version-update:semver-major
...

Signed-off-by: dependabot[bot] <support@github.com>
2025-08-13 18:11:18 +00:00
Bo Chen
7d60ab70e6 build: Run integration tests on smaller VMs
Signed-off-by: Bo Chen <chen.bo@intel.com>
Signed-off-by: Rob Bradford <rbradford@rivosinc.com>
2024-03-01 07:24:14 +00:00
Rob Bradford
1db30405e1 build: Cancel in progress actions on update
If the PR updated cancel outstanding jobs to conserve resources.

Signed-off-by: Rob Bradford <rbradford@rivosinc.com>
2024-02-28 20:11:20 +00:00
Rob Bradford
f15ca1aec3 build: Make the Windows Guest Test always pass on PR builds
When running with the merge queue the tests will be fully executed.

Signed-off-by: Rob Bradford <rbradford@rivosinc.com>
2024-02-28 20:11:20 +00:00
Rob Bradford
d9f48505fe build: Ensure all required checks run on merge_group
And clean up some of the whitespace formatting so that the "name" and
"on" are grouped away from the "jobs".

Signed-off-by: Rob Bradford <rbradford@rivosinc.com>
2024-02-28 20:11:20 +00:00
Ravi kumar Veeramally
ba6bfee4ff build: Add GitHub action for Windows guest integration tests
Signed-off-by: Ravi kumar Veeramally <ravikumar.veeramally@intel.com>
Signed-off-by: Rob Bradford <rbradford@rivosinc.com>
2024-02-27 20:33:49 +00:00