Move the live migration test running from their own script into the
x86-64 script (on aarch64 they were already in the same script.) They
were historically separate as they were new. Now they are established it
makes sense for them to be combined.
The timeout in the GitHub workflow has been extended to accommodate the
extra work in the same step.
The Rust test scopes are unchanged - the running of the tests has been
moved.
Assisted-by: Claude:Opus-4.7
Signed-off-by: Rob Bradford <rbradford@meta.com>
Increase the number of parallel integration tests in CI to save ~3-5
minutes per x86_64 run. The thread limit is driven by RAM and disk
space constraints, not CPU availability.
A new `PARALLEL_INTEGRATION_TESTS_NUM` environment variable controls
the thread count. In CI it is set explicitly (12 for x86_64, 25 for
ARM64); locally it falls back to `nproc / 4`, preserving the previous
behavior.
Only the first test group (`common_parallel`, `live_migration_parallel`)
uses the overridden value - subsequent groups (dbus_api, fw_cfg,
ivshmem, aarch64_acpi) continue to use the `nproc / 4` default.
On-behalf-of: SAP philipp.schuster@sap.com
Signed-off-by: Philipp Schuster <philipp.schuster@cyberus-technology.de>
TL;DR: Would reduce CI pressure by cancelling more "unnecessary" runs
but I can't verify without running a merge queue.
A common development pattern is to push a change and then immediately
check CI results. Follow-up fix pushes are quite common, which leads to
multiple CI runs being queued for the same pull request.
In Cloud Hypervisor, the size and cost of the CI matrix means that
several consecutive pushes (for example 3-4 in a short time) put
significant pressure on CI runners and noticeably increase feedback
latency.
In practice, concurrency handling is especially tricky for the merge
queue. From personal experience: If one does not take special care, CI
runs triggered by a `merge_group` can cancel each other, as in a merge
queue there are two runs for each job by default: one for the normal PR
and one for the merge commit. This is easy to run into, also because the
available documentation and best practices for this feature are not very
good.
At the same time, our workflows do not run on `push` events, but only
on `pull_request` and `merge_group`. Because of this, using
`${{ github.ref }}` alone as a concurrency key is not very meaningful,
and in practice only few runs are actually cancelled for successive PR
updates. Therefore, we should improve the usage of this feature.
This change tries to improve the situation by refining the concurrency
group key. The goal is to keep cancellation for multiple PR pushes,
while at the same time preventing unintended cancellations in the merge
queue by separating `merge_group` runs from regular PR runs.
Signed-off-by: Philipp Schuster <philipp.schuster@cyberus-technology.de>
On-behalf-of: SAP philipp.schuster@sap.com
And clean up some of the whitespace formatting so that the "name" and
"on" are grouped away from the "jobs".
Signed-off-by: Rob Bradford <rbradford@rivosinc.com>
To reduce issues caused by flaky tests split the musl and glibc jobs
into separate jobs. This means fewer jobs will need to be restarted for
flaky tests. This will also increase CI throughput since the musl builds
account for ~40% of the total CI time when run together with glibc.
Signed-off-by: Rob Bradford <rbradford@rivosinc.com>