Integration test often time out because the machine is loaded. Instead of increasing timeout, this change hopes to address the issue by limiting the number of tests running simultaneously. Add a new flag in integration.go to specify the maximum number of concurrent tests. Set the default in travis and shippable configurations to be 4.
2.0 KiB
Executable File
2.0 KiB
Executable File